Company Profile

A complete overview of HH Water Drops Company Ltd — our capabilities, equipment, team, and commitment to quality.

HH Water Drops drilling operations Engineering team
100+
Projects
Delivered

HH Water Drops Company Ltd

Registration

HH Water Drops Co. Ltd

Year Established

2009

Headquarters

Kitale, Trans Nzoia, Kenya

Service Area

All 47 Counties, Kenya

Staff

35+ Technical & Support Staff

Certifications

WRMA · NEMA · EBK · NCA

HH Water Drops Company Ltd is a fully licensed borehole drilling and water engineering company with over 15 years of operational experience across Kenya. We are committed to delivering technically superior, environmentally responsible, and cost-effective water solutions to homes, farms, institutions, and businesses.

Request a Quote

Our Fleet & Equipment

We operate a modern, well-maintained fleet of drilling rigs, survey instruments, and support vehicles to deliver projects anywhere in Kenya.

Drilling Rigs

DTH Rotary Rig – Unit 1

Water well drill capable of 300m depth. Air compressor 750 CFM / 350 PSI. Suitable for all geology types.

DTH Rotary Rig – Unit 2

Heavy-duty water borehole rig, 250m capacity. Ideal for deep hard-rock aquifer drilling in basement terrain.

Mud Rotary Rig

200m capacity mud rotary drill. Optimal for soft formation and alluvial aquifer drilling in the Rift Valley floor.

Light Percussion Rig

Compact cable tool rig for shallow domestic boreholes and site access-restricted locations. 80m capacity.

High-Pressure Air Compressors

3× dedicated compressor units (750, 900 and 1050 CFM) for borehole development and air-lifting operations.

Drill String & Tooling

Full range of drill rods, DTH hammers, tri-cone bits, stabilisers, and casing drivers for all diameter boreholes.

Survey & Monitoring Equipment

ABEM Terrameter SAS 4000

Advanced electrical resistivity tomography (ERT) system for 2D subsurface imaging and aquifer mapping.

VES Sounding Equipment

Vertical electrical sounding (Schlumberger array) for depth probing and aquifer depth determination.

CCTV Downhole Camera

High-definition colour borehole camera for casing inspection, pump diagnostics, and rehabilitation surveys to 200m.

Water Level Meters

Electronic water level meters (300m range) and pressure transducers for continuous data logging during pump tests.

Field Water Quality Kit

Multiparameter field testing kits for pH, EC, TDS, turbidity, iron, and other key water quality parameters on-site.

GPS & Mapping Tools

Trimble GPS units and GIS software for precise borehole location, geological mapping, and spatial analysis.

Vehicles & Support Fleet

Drilling Rig Carriers (4×4)

4× heavy-duty 4WD rig carriers capable of accessing remote, off-road drilling sites across Kenya's varied terrain.

Water Bowser Trucks

2× water bowser tankers (10,000L each) for drilling water supply, borehole development, and emergency services.

Survey & Technical Vehicles

4× 4WD survey vehicles for hydrogeologists, engineers, and project supervisors. Equipped with field instruments.

Technical Team Breakdown

35+ dedicated professionals bringing certified expertise to every project.

2

Hydrogeologists

PhD & MSc qualified, specialising in groundwater surveys & aquifer analysis

3

Drilling Engineers

Certified drilling engineers with 10–20 years field experience in Kenya's geology

4

Pump Technicians

Trained submersible pump specialists and solar system installers

8

Drill Crews

Experienced drilling crew members per rig, trained in safety and borehole construction

3

Civil Engineers

Pipeline, tank, and infrastructure specialists for water distribution projects

2

Water Quality Analysts

Field and laboratory water quality testing and treatment system specialists

5

Project Managers

Experienced PMs ensuring every project is delivered on time and on budget

8

Support & Admin Staff

Logistics, procurement, finance, and client relations professionals

Safety Standards & Environmental Commitment

We operate to international HSE standards and are committed to protecting Kenya's environment for future generations.

Health, Safety & Environment (HSE)

PPE & Site Safety

All field staff wear full PPE (helmets, gloves, safety boots, high-vis vests). Daily toolbox talks and JSAs before every work shift.

Emergency Preparedness

All rigs carry first-aid kits, fire extinguishers, spill response kits, and emergency contact lists. Staff are trained in first aid.

Incident Reporting

Zero-tolerance near-miss and incident reporting culture. All incidents are investigated and preventive measures implemented immediately.

Safety Training

All staff undergo regular HSE training, first-aid certification, and equipment operation safety refreshers every 12 months.

Environmental Commitment

Aquifer Protection

All boreholes are properly cased, sealed, and grouted to prevent surface contamination entering the aquifer — protecting Kenya's groundwater resources.

Waste & Cuttings Management

Drill cuttings and drilling fluids are managed and disposed of responsibly in designated areas, minimising soil and water contamination.

Promoting Renewable Energy

We actively promote solar pump adoption to reduce diesel generator dependence and carbon emissions in rural water supply systems.

Site Restoration

All drill sites are restored to their pre-drilling condition upon project completion — backfilling, grading, and vegetation reinstatement where required.

Our Quality Standards

Every project is executed to international water well construction standards with full documentation and client reporting.

Documented Procedures

Written standard operating procedures (SOPs) for every aspect of our drilling, survey, equipping, and testing operations.

Water Quality Testing

Every completed borehole undergoes accredited laboratory water quality analysis before handover to ensure drinking water safety.

Performance Monitoring

We track borehole yield and water levels during test pumping and provide comprehensive hydrogeological completion reports.

Standards Compliance

All construction follows Kenya Water Act 2016, WRMA technical guidelines, and WHO water well construction standards.

Client Handover

Full handover documentation including as-built borehole logs, pump specifications, test pump report, and operation manual.

Post-Project Support

12-month defects liability period and ongoing annual maintenance contracts to keep your system performing optimally.

Ready to Work with Kenya's Leading Water Engineers?

Contact us today for a free site assessment and professional project quotation.

 24/7 Emergency Water Services: Pump breakdowns, borehole failures — call us anytime 0715 031 600 or 0727 127 760

Chat on WhatsApp